564
views
views
As a structural engineer or site engineer, we frequently work with various types of designs and details. One word, “development length,” or the denotation “Ld,” is mentioned in the drawing.
Do you understand what “development length” means? Where should development length be provided and why should we supply it?as well as how to determine development length.
What Is Development Length?
To achieve the appropriate bond strength between steel and concrete, the minimum length of the steel bar needs to be firmly attached to the column.The strong link between column-to-footing and column-to-beam structural elements is caused by development length.
In buildings, we are aware of how to shift loads. The weight travels from the slab to the beam, then the beam to the column.
The column to the footing, and finally the footing to the ground. We must verify the component joints in order for this cycle to function properly.