views
A lot of space, as well as between 35 and 40 lakh rupees, are required to install an electric charging station. Additionally, the age range for installation of an E-Bike Charging Station must be between 20 and 60. There should be room for five chargers, easy parking of the car on all chargers, and parking for cars that are waiting to be charged. In order to install an electric charging station, 5 chargers are required, 3 of which must be fast chargers and 2 must be slow chargers. Fast chargers are used to quickly charge automobiles, while slow chargers are used to quickly charge two- and three-wheeled vehicles. In the charger, the first name will be CCS which will be 50 KW, second Chandemo will also be 50 KW and third Type 2AC which will be 22 KW. And Slow Charger First charger Bharat DC – 001 of 15 KW and second India AC – 001 will have three pins of 3,3 KW. total will be of 9 KW.
Read More- https://coherentmarketinsightsus.blogspot.com/2022/09/electrified-bikes-scooters-and.html