199
views
views
India had increased its target for renewable energy to 175 GW in 2015 out of which a target of 40GW was assigned to the Rooftop Solar PV segment. Unfortunately, the rooftop solar sector has been fettered with slow growth.
Read this blog to know about all the challenges encountered in “Government Policies and Regulations for Solar Energy in India” and the solutions that have been worked out.